Floor plan se lekar municipal approval tak — Bihar aur UP mein naksha pass karane ka step-by-step process aur zaroori documents.
Step 1 — Site Survey Aur Soil Check
Naksha banane se pehle plot ka actual measurement, direction aur level check hona chahiye. Kai baar registry ka size aur actual site ka size alag nikalta hai — isliye physical survey zaroori hai.
Multi-storey ke liye soil bearing capacity test bhi karwana chahiye, taaki foundation design sahi ho.
Step 2 — Floor Plan Aur Structural Drawing
Architect pehle floor plan banata hai — room layout, staircase position, ventilation aur parking. Approve hone ke baad structural engineer column, beam aur slab ki drawing banata hai.
Yahi drawings municipal approval aur actual construction dono ke liye use hoti hain, isliye inka accurate hona zaroori hai.
Step 3 — Municipal Approval Ke Documents
Aam taur par chahiye: plot ki registry ya sale deed, latest rasid (property tax receipt), mutation papers, site plan, building plan drawings, aur registered architect ka certificate.
Patna Municipal Corporation aur zyadatar UP nagar nigam ab online submission lete hain. Approval mein aam taur par 3-8 hafte lagte hain, plot size aur zone ke hisaab se.